Theron H2O is actively seeking investors to raise between $10 million to $30 million in startup funding. In exchange for this investment, I am offering a stake of 10% to 30% in Theron H2O USA, along with a unique two-year buyout clause.
This means that after two years, investors have the option to exit the investment with a full return of their initial capital plus a buyout of the ‘then’ current valuation of the company. This opportunity not only promises a robust return but also aims to establish a mutually beneficial partnership as we develop our innovative solutions in the energy/water/reverse osmoses Data Center sector.
If you’re interested in discussing this further, I would love to provide more details about my vision to change the world for the better and the potential for growth.
There are 5,500 US Data Center currently, and replacing only 5,000 of them with my ATMAG GENSETS will create $360 Billion. Estimates for operational data centers globally range from around 12,000 to over 15,000 as of late 2025/early 2026.
That’s $1.350 TrillionCall Me or FaceTime, Signal or WhatsApp me: (561) 853-6892
To Investors.
What do I want to do with your money?
- Take that money and leverage it to purchase a manufacturing facility.
- Start manufacturing PMG and AWG generators (free water and free electricity).
- Replace all 5,500 US data centers power and hydro sources with Theron H2O ATMAG GENSETS.
- Expand Theron H2O USA globally to Theron H2O International and help make AI unstoppable for humanity.
- Timeline – 10 years. That just in the AI space, $13 Trillion. If you stay the duration, your cut is $4T
Data centers in the US range from 60MW to 100MW in 24/7/365 power demand. A four shipping container Theron H2O permanent magnet water generator cluster will produce 20MW. A 12 shipping container 60MW Theron H2O power cluster can greatly expand the output. All off-grid, behind-the-meter, on site with zero emissions, zero monthly utility bills, and minimal maintenance. Theron H2O permanent magnet generator shipping container clusters can be installed above ground, or in buildings. Each Theron H2O permanent magnet water generator runs at 10,000 to 21,000 RPM, 24/7/365 with a five-year replacement warranty if needed.
Theron Energy USA can also add 1,000 gallon to 32,000 gallon per day atmospheric water generators, ATMAG GENSET, (atmospheric magnetic generator sets) for data center cooling (reducing or eliminating local water fees) at an additional cost for any commercial or industrial project.
Data centers demand power 24/7/365. Wind and solar energy are too intermittent. Natural gas power plants are for peaking. That leaves modular nuclear and coal plants for large data center base load power, which take years to get approval and build, plus additional years to upgrade and modernize the power grid. After startup funding is received, Theron H2O USA believes its permanent magnet generators can be produced, delivered, and installed in 3-12 months at existing or future data centers or industrial applications.
Unlike unsightly and ineffective wind turbines and solar farms, which destroy wildlife, green space, and productive farmland, Theron Energy Permanent Magnetic Generators (PMGs) are a non-polluting, disruptive technology. Theron Energy PMGs provides truly clean, green, sustainable and perpetual electricity for years and even decades. Theron Energy PMGs are not standby or backup generators. They are permanent, continuous power generators for nearly all off-grid applications. Theron Energy PMGs will have a lifetime repair or replacement warranty for 25 to 100 years.
Theron H2O USA power and water generation technologies are critical for large data center projects, mining applications, large housing developments, ski resorts, grain elevators, or other high-power use/high utility bill applications. Global data centers alone, existing and planned, are a $trillion annual market.
- Fossil Fuels Natural gas currently supplies the largest portion of electricity for U.S. data centers and is projected to continue playing a key role in the near future.
- Renewables Wind, solar, and geothermal power are also used, with some tech companies announcing agreements with renewable and nuclear power startups.
- Nuclear Power This source is expected to play a larger role in the future, with companies exploring advanced designs like small modular reactors or fusion plants to provide reliable, high-density power.
- Water Management Data centers require billions of gallons of water annually for cooling systems, a significant environmental concern that drives the need for more efficient and sustainable cooling solutions.
At THERON H2O we combine Atmospheric Water Generators – AWG with Permanent Magnetic Electric Generators – PMG and Reverse Osmosis – RO. ATMAG GENSETS.
Notice to Capital Raisers:
If you have investors in mind or have questions, feel free to contact me at your convenience.
A generous finder’s fee of 5% ($500,000 to $1.5 million) can be shared with those finders bringing investors to make the investment and closing the deal.
Thanks for your interest. Cornelius Theron CEO and Founder, Theron H2O

